Independent Public Administrative Repository

Lal Lal Wind Farm Administrative Record

A permanent public repository for the Trustee's administrative and evidentiary record, structured around the governing planning framework, mandatory technical requirements, Freedom of Information record, and independent documentary verification.

Repository
Live
Record
Crystallised at 29 June 2026
Current package
Prepared / pending issue
Website version
3.0
Repository centrepiece

Independent Documentary Verification

The repository is organised around one central question: can an independent reader verify the mandatory planning and technical requirements from the disclosed administrative and documentary record?

The verification pathway

The Documentary Verification Schedule connects the governing law, Planning Permit, NZS 6808:2010, the endorsed Noise Compliance Testing Plan, post-construction assessment, environmental auditor material, Freedom of Information records and the Trustee's administrative record.

Important: The Schedule does not determine compliance, breach, liability, legal rights or regulatory findings. It records whether the disclosed record enables independent reconciliation of mandatory requirements.

Core documentary issues

K15aa Background Sound Record
NCTP requirement, replacement monitoring, later reliance and disclosure record.
Central
NCTP Mandatory Requirements
Measurement locations, timing, reporting and SAC assessment requirements.
Framework
Planning Permit Amendment
Administrative transition involving Conditions 23–27 and the NCTP framework.
Transition
Repository principle

Evidence before opinion

This site is designed to make the administrative record easy to follow. Statements are presented as documentary facts, statutory or technical framework references, or administrative observations. The repository does not substitute its own findings for the disclosed record.