Administrative timeline

Chronology

Regulatory and administrative chronology for the Lal Lal Wind Farm record.

Chronology

Administrative and technical chronology

The chronology is structured to show how the governing framework, technical documents, FOI disclosure record and Trustee administrative record developed over time.

Period / DateRecord eventRepository significance
Planning frameworkPlanning Permit PL-SP/05/0461 and operational noise conditionsConditions 23–27 establish the operational noise governance framework later examined in the record.
2017Background monitoring and NCTP preparationFoundation for operational noise limits and later compliance methodology.
23 January 2018Noise Compliance Testing PlanEndorsed methodology including K15aa, measurement locations, timing, reporting and SAC pathways.
2019Construction and commissioning chronology; K15aa replacement monitoringCentral to the background sound and commissioning record.
2021Stage 1 Elaine material and K15aa baseline monitoring reportRecords reliance upon the 2019 K15aa monitoring position.
2022NMP, auditor correspondence and SLR Elaine noise compliance letterConnects J14aa / 308 Elaine-Mount Mercer Road with K15aa reference location and NMP custody questions.
2023–2024Stage 1 and Stage 2 post-construction assessment materialOperational compliance reporting, SAC observations and auditor material form part of the disclosed record.
2024–2025Historical Beneficiary FOIsEPA FOI-002, FOI-031, FOI-060 and FOI-066 contribute to the historical source record.
2026Trustee SRAMs, Annexes and documentary verificationHistorical and disclosed material organised into the continuing administrative record.
29 June 2026Crystallisation of supplementary recordCurrent administrative and evidentiary record crystallised for further administrative communication.
Website v3.0Repository converted into issue-led public archiveIndependent Documentary Verification, K15aa, NCTP, NZS and SAC pages elevated as public guides to the record.