Post-construction noise record

Yendon Stage 1

A plain-English documentary chronology of the Yendon Stage 1 monitoring campaigns, the 2021 report-status record, the later completed assessment, and the treatment of frog noise and wet-weather conditions.

How to read this page: The purpose is to place the source records next to one another. Where two records do not readily reconcile, the page identifies the documentary question but does not convert that question into a legal or compliance conclusion.
At a glance

What the record shows

The Yendon Stage 1 pathway did not proceed as one continuous monitoring-and-reporting exercise.

Three monitoring periods are described

The 2024 SLR information session describes Yendon monitoring in March–May 2021, September–October 2021 and a later successful campaign in May–August 2022. The final Yendon report also contains differing descriptions of the 2022 start date, which are reproduced below.

Two documentary questions stand out

First, the 26 October 2021 CRG minute records that a Yendon report was already being reviewed by the EPA auditor, while the later SLR explanation says a post-construction compliance report was not produced from the 2021 monitoring. Second, frog noise becomes central to the 2022 assessment even though the 2021 Appendix D observations at Yendon and Elaine do not record frogs. ARUP's later verification also records marginal exceedances under the alternative 0.5 dB method, SLR's attribution of those exceedances to seasonal wildlife noise, and the auditor's position that the assessment did not then demonstrate compliance for all noise-sensitive receivers.

1 · Monitoring chronology

How Yendon Stage 1 developed

The sequence below separates continuous compliance monitoring from later attended listening surveys so the dates are not conflated.

March–May 2021

Yendon monitored at the same time as Elaine

At the public information session, SLR stated that Yendon was monitored simultaneously with Elaine between March and May 2021. The later explanation was that the Yendon data were not sufficient for a compliance result because turbine outages associated with blade rectification works reduced the valid data yield.

11 June 2021

Additional attended surveys

The Elaine Stage 1 Appendix D contains attended observations at Yendon on 11 June 2021, after the March–May unattended monitoring period. In the information-session Q&A, Gustaf Reuterswärd said that SLR had gone back and done surveys while “trying to get Yendon a second time”. The transcript then explains that the June work supplemented earlier listening surveys undertaken in low-wind or cut-in conditions.

September–October 2021

Second compliance-monitoring campaign

The information-session presentation identifies a second Yendon compliance-monitoring period between September and October 2021. SLR later described both 2021 rounds as inconclusive because there was not enough valid data.

26 October 2021

CRG records repeat testing and a Yendon report under auditor review

The Community Reference Group update says Yendon noise testing had to be repeated because of the low number of operating turbines during the earlier testing. The same update also says the Yendon report was being reviewed by the EPA auditor and would be available in early 2022.

2022

Later monitoring produces the Yendon Stage 1 assessment

SLR's information-session presentation describes a later campaign from about May to August 2022 as “third time's lucky”. The final report was eventually auditor-verified on 7 December 2023.

The 2022 report does not give one consistent start date

Source locationMonitoring period stated
Yendon report — IntroductionNoise monitoring conducted between June 2022 and August 2022.
Yendon report — methodology tableApproximately nine weeks, 26 May 2022 to 1 August 2022.
Yendon report — ConclusionApproximately 60 days, 26 June 2022 to 1 August 2022.
2024 information-session transcriptApproximately 67 days, “sort of between May and August 2022”.
Documentary position: The available report and later public explanation therefore contain more than one description of when the successful 2022 Yendon monitoring campaign began. This page does not select one date as correct where the source record itself is inconsistent.
2 · Report status

What was the “Yendon report” in October 2021?

Two later records describe the 2021 reporting position differently.

Extract of 26 October 2021 Community Reference Group post-construction noise testing update
26 October 2021 CRG minute extract. The update records that Yendon testing was being repeated because too few turbines had been operating, while also stating that the Yendon report was being reviewed by the EPA auditor and would be available early in 2022.
Later SLR public explanation. Gustaf Reuterswärd says the 2021 Yendon data were not ultimately used for compliance assessment and that SLR did not produce a post-construction compliance report from that monitoring.
Question raised by the record: The 26 October 2021 minute records a Yendon report already under EPA-auditor review, while the later SLR explanation says no post-construction compliance report was produced from the 2021 monitoring. The presently published material does not identify what document was under auditor review in October 2021 or reconcile those two descriptions.
3 · Attended observations

2021 and 2022 — the frog record changes

The comparison is useful because the Elaine Stage 1 Appendix D does not only contain Elaine observations. It also records attended observations at Yendon. The last attended observations reproduced in the Elaine Stage 1 Appendix D are dated 11 June 2021; the Yendon Stage 1 Appendix D continues to 17 June 2022.

2021 — Elaine Stage 1 Appendix D

The 2021 Appendix D records attended listening at Yendon and Elaine on 10 March, 31 March and 11 June 2021. The entries identify birds, insects, traffic, wind, machinery, livestock and turbine sound. No frog observation is recorded in the Appendix D listening notes at either the Yendon or Elaine survey entries.

The report uses “frog” once elsewhere in a generic description of the NCTP extraneous-noise screening process; that is different from an attended observation recording frogs at a survey location.

2022 — Yendon Stage 1 Appendix D

The later Yendon Appendix D repeatedly records frogs during attended surveys, including descriptions such as “frogs continuous”, “frogs prominent”, “frogs dominant”, “distant frogs” and “WTG dominant over frogs”. The observations span receptor, intermediate and near-turbine positions.

The difference is therefore visible within SLR's own attended-observation records, without needing to infer the presence or absence of frogs from noise measurements alone.

2022 Yendon exampleAppendix D observation
K34aa — 26 May 2022“Frogs continuous”
M29aa — 16 June 2022“Frogs prominent”
K34aa — 17 June 2022, 12:20–12:40 am“Frogs dominant”
Near YSTW36 — 17 June 2022“WTG dominant over frogs”
K34aa — 17 June 2022, 1:20–1:50 pm“Frogs dominant”
Yendon Appendix D extract showing 17 June 2022 attended observations at K34aa, N31ab and M29aa
Yendon Appendix D — 17 June 2022. At 1:20–1:50 pm K34aa is recorded as “Frogs dominant” under partly cloudy, no-rain conditions. Later that afternoon M29aa records frogs under sunny conditions. These are attended-listening observations, not unattended monitoring data.
4 · Frog-noise explanation

Frogs become material to the Yendon assessment

The Yendon report does more than record frogs in the listening notes. It relies on frog activity when explaining the measured data and the compliance assessment.

What the Yendon report says

SLR states that the June–July 2022 survey period was quite wet and that a significant proportion of survey data was affected by frog noise, particularly at night.

In its conclusion, SLR says extended wet weather resulted in very high and widespread frog populations, that frog-call noise was significant at most locations, and that residual frog influence remained in the valid data set. The report says that residual influence served to artificially elevate the derived wind-turbine noise level.

Appendix F is then devoted to an Insect/Frog Noise Screening Analysis, including selected audio periods and an assessment of frog/insect influence that was not removed by the NCTP screening method.

Information-session extract — frogs and wet conditions. Gustaf Reuterswärd explains the prominence of frogs during the Yendon campaign and their effect on the assessment data.
Why this matters to the documentary comparison: Frog activity is not a peripheral observation in the final Yendon report. It is part of SLR's explanation for data exclusion, residual extraneous-noise influence and the interpretation of the derived wind-turbine noise level.
5 · Rainfall comparison

Match the rainfall period to the observation or measurement period

The rainfall comparison is separated into two different questions: rainfall relevant to the attended listening surveys, which had finished by mid-June, and rainfall relevant to the longer unattended monitoring campaign, which continued through July and ended at the latest on 1 August 2022.

Bureau of Meteorology monthly rainfall table for station 087068 showing 2021 and 2022 totals
Bureau of Meteorology Climate Data Online — station 087068. Supplied screenshot showing monthly rainfall totals for 2021 and 2022. The comparisons below are simple sums of the displayed monthly values.
Yendon Stage 1 Table 3 showing monitoring periods beginning 26 May 2022 and ending between 18 July and 1 August 2022
Yendon Stage 1 — Table 3. N31ab is recorded from 26 May to 18 July 2022; M29aa and K34aa from 26 May to 1 August 2022. The August monthly rainfall total therefore falls outside the substantive monitoring period and is not used in the comparison below.

A. Rainfall relevant to the attended observations

The last attended observations shown in the Elaine Stage 1 Appendix D are dated 11 June 2021. The Yendon Stage 1 Appendix D observations continue to 17 June 2022. July and August rainfall therefore cannot explain frog calls recorded during those attended surveys.

Displayed monthly period20212022
January–June374.0 mm320.4 mm
March–June252.8 mm211.2 mm
May–June166.0 mm91.2 mm
June84.6 mm62.6 mm

The displayed monthly totals are higher in 2021 for each of these periods. Because monthly totals include rainfall after the individual June listening dates, they do not establish the precise rainfall that had accumulated before 11 June 2021 or 17 June 2022. Daily rainfall records would be required for that narrower comparison.

B. Rainfall relevant to the unattended monitoring

The Yendon Table 3 record shows monitoring commencing on 26 May 2022. N31ab ended on 18 July, while M29aa and K34aa continued to 1 August. For a monthly comparison, May–July therefore captures the substantive monitoring months without importing the later August rainfall.

Displayed monthly period20212022
January–July426.2 mm364.0 mm
May–July218.2 mm134.8 mm

On the displayed BOM totals, 2021 was also wetter over these broader comparison periods.

Documentary comparison: The supplied monthly rainfall record does not show greater rainfall in 2022 over the months leading into and encompassing either the attended-observation period through June or the substantive unattended-monitoring period through July. The much wetter annual outcome for 2022 was driven by rainfall later in the year, which should not be used to describe conditions that had already been observed or measured.
Question raised by the record: How does the Yendon report's explanation that an extremely wet season leading into and during the June–July 2022 campaign produced very high frog activity reconcile with the comparable 2021 rainfall totals and the absence of recorded frogs in the 2021 Appendix D attended observations? Rainfall totals alone cannot establish frog populations or calling activity, so this remains a documentary comparison rather than a biological conclusion.
6 · Independent auditor

ARUP: the alternative analysis produced marginal exceedances

The independent auditor's 7 December 2023 verification extract shows why SLR's treatment of seasonal wildlife noise mattered to the compliance result.

ARUP Yendon verification extract dated 7 December 2023 recording marginal exceedances and the auditor's compliance position
ARUP Verification of Post-Construction Noise Assessment — 7 December 2023, page 17 extract. Supplied documentary extract reproduced so readers can compare the auditor's wording directly.

What the auditor records

ARUP records that the 0.1 dB “NCTP method” indicated compliance at measurable wind speeds, although with a relatively small night-time compliance margin around 10–11 m/s.

ARUP then records that, using the alternative 0.5 dB screening method, the measured operational wind-farm sound level marginally exceeds the established noise limits around 10 m/s at N31ab and K34aa.

The auditor records that SLR attributed the marginal exceedance to seasonal extraneous noise from wildlife.

ARUP's resulting position was that the assessment in the Post-construction Assessment Report did not currently demonstrate that the Yendon WEF complied with the noise limits for all noise-sensitive receivers in accordance with Condition 23 of the Planning Permit.

Documentary significance: The page does not treat the 0.5 dB result as a separate legal finding of non-compliance. It records that the alternative analysis produced marginal exceedances, that SLR attributed those exceedances to seasonal wildlife noise, and that the auditor did not at that stage consider the assessment to demonstrate compliance for all noise-sensitive receivers.
7 · Present documentary position

What is established — and what remains unresolved

Established by the published material

  • Yendon monitoring was attempted during 2021 and later repeated.
  • The 26 October 2021 CRG minute records a Yendon report under EPA-auditor review.
  • SLR later said the 2021 Yendon monitoring did not result in a post-construction compliance report.
  • The eventual successful Yendon monitoring occurred in 2022, although the final report contains differing start-date descriptions.
  • The 2021 Elaine Stage 1 Appendix D includes Yendon observations and does not record frogs in the attended-listening notes.
  • The 2022 Yendon assessment repeatedly records frogs and makes residual frog noise material to interpretation of the assessment data.
  • ARUP's 7 December 2023 verification records marginal exceedances under the alternative 0.5 dB screening method at N31ab and K34aa, records SLR's attribution to seasonal wildlife noise, and states that the assessment did not then demonstrate compliance for all noise-sensitive receivers.

Questions left by the record

  • What Yendon report was under auditor review in October 2021?
  • How should the differing 2022 monitoring start dates in the Yendon report be reconciled?
  • How does the wet-season / wildlife-noise explanation reconcile with the time-aligned 2021 rainfall and attended-observation record?

Later substantive responses or documentary corrections can be incorporated into this page if identified.

Primary sources

Documents used on this page

SLR — Yendon Stage 1 Post-construction Noise Assessment
October 2023 · SLR Ref 640.11872-R15
Open PDF
SLR — Elaine Stage 1 Post-construction Noise Assessment
October 2023 · SLR Ref 640.11872-R04
Open PDF
SLR Public Information Session — transcript
Stage 1 Elaine and Yendon public explanation
Open transcript